Schedule to run MWF

Users Who Are Viewing This Thread (Total: 0, Members: 0, Guests: 0)

BR260354

Member
Joined
Aug 28, 2022
Messages
110
Reaction score
8
Location
The Woodlands, TX
I've setup a couple of Versa pumps for my AWC.....runs great. I have the two pumps connected via a Y cable to one of the Force ports on the Kraken. I setup my schedule to run within Mobius which runs every morning. There's no way to skip days in Mobius, but was hoping to schedule power to the Versa pumps on Monday / Wednesday / Friday. I only see 24 hour in Hydros. Am I missing something? Thanks!
 
Well, bottom line, I want to turn on a Generic output every M / W / F.

Presently only able to run daily schedules with start and end times or repetative patterns throughout the day. Alternative would be to create a flow pump output using type demo pump, associating that with a schedule then making the generic output depend off if off on the demo pump. A little bit of a pita presently but it works. Another alternative is just run daily for the time being and stay tuned for other options soon.
 
Yea, I thought about something like that. I was playing with schedules and looking to make it dependent, but didn't do it with flow pump. A little wonky, but if it works....
Not a huge deal, more of a nice to have at this point. I guess another option is to cut my AWC volume by half.
 
Yea, I thought about something like that. I was playing with schedules and looking to make it dependent, but didn't do it with flow pump. A little wonky, but if it works....
Not a huge deal, more of a nice to have at this point. I guess another option is to cut my AWC volume by half.

Both viable options. And option 3 is stay tuned.
 
Back
Top