Compy Ginorio
New member
I'm switching controllers over my WB180.5 from NA to Hydros.
I got the WE up and running for few day's now, and I got all the cables I think I needed to create a collective. My plan is to connect the WE as main power, to power the complete collective. The other two controllers are Control 4 and XS in that order from right to left.
I brought two Data/Power Cable to make the connection and a Terminator.
But my questions are for now... if...
1. This setting will work as I planned? WaveE 》Control 4 》XS and the WE as the power source.
2. Or... Did I need to power up the Control 4 as well... and need to buy a Data Only Cable and Isolate the Control 4 and XS to power up the C4, and just data from Control 4 to the WE?
This will mean few more day's on halt with the installation. The tank is running for years now, but I still need to hook up ATO, water sensors, Klir, Kalk Reactor, Dosing pumps and few gadget along the wifi power strips 3 in total.
I appreciate all the help,
Compy
I got the WE up and running for few day's now, and I got all the cables I think I needed to create a collective. My plan is to connect the WE as main power, to power the complete collective. The other two controllers are Control 4 and XS in that order from right to left.
I brought two Data/Power Cable to make the connection and a Terminator.
But my questions are for now... if...
1. This setting will work as I planned? WaveE 》Control 4 》XS and the WE as the power source.
2. Or... Did I need to power up the Control 4 as well... and need to buy a Data Only Cable and Isolate the Control 4 and XS to power up the C4, and just data from Control 4 to the WE?
This will mean few more day's on halt with the installation. The tank is running for years now, but I still need to hook up ATO, water sensors, Klir, Kalk Reactor, Dosing pumps and few gadget along the wifi power strips 3 in total.
I appreciate all the help,
Compy