It would not cost $300 to get two more drive ports. The X2 controller only is 159.99. You would need a buss cable which is 9.99 for a 6ft one. A 1ft one is a little cheaper. You would also need a terminator which is 4.99. Then all you would need to do is start a collective and they would share all inputs and outputs just like a single controller. They are also coming out with a 8 outlet wired controller that would work using a power pack with the pumps. I would hesitate in using a wifi strip for this because if you loose wifi signal during a water change it could leave a pump running or not complete the water change. I have a X4 and 2 X2's for a total of 6 drive ports in my collective. All 6 are in use either driving pumps or solenoids for the RODI.